If you sit on a condo board, there is a good chance an engineering report has come up lately — from a lender, a buyer’s agent, or a neighbor who could not close on a sale. The lending rules most condo buyers depend on got noticeably stricter in 2026, and a recent engineering report is often how an association shows that its buildings are sound.
This post explains what an engineering report is, why lenders care, how it differs from a reserve study, and what your board can do now. It is the written companion to our short video on the same topic.
General information as of November 2026, not legal or lending advice. Lending rules change; check the current guidance or ask a professional before you rely on any of this.
What is an engineering report?
An engineering report is a licensed engineer’s written assessment of a building. The engineer inspects the structure and major systems — typically the roof, foundation, balconies, building envelope and mechanical systems — and reports on their condition, what needs repair, how urgent each item is, and often what it might cost.
You will hear it called a structural inspection, a property condition assessment or a building inspection report. The names vary; what lenders care about is what the document says about safety and soundness, and whether anything serious is left unaddressed.
Why lenders care more in 2026
Most buyers who finance a condo use a conventional mortgage that a lender later sells to Fannie Mae or Freddie Mac. To be sellable, the loan has to meet those two companies’ rules, and those rules cover the whole condo project, not just the unit and the buyer. Updated requirements took effect in 2026, and lenders reviewing a project now look harder at its physical condition, its special assessments and its reserves.
These are lending rules, not laws. No one is fining an association for not having an engineering report. The consequence is practical: if a project does not meet the rules, buyers may not be able to get the loans they were counting on.
The lender questionnaire
When a unit sells, the buyer’s lender usually sends the association a questionnaire. One of the questions asks, in effect, whether the association knows of any deficiency in the safety, soundness, structural integrity or habitability of its buildings. According to CAI’s June 2026 guide for associations , the documents that back up the answer include board minutes, a building inspection report or engineer’s report, reserve studies and a maintenance schedule.
What Fannie Mae’s rules actually say
The detail lives in Fannie Mae’s Selling Guide, section B4-2.1-03, Ineligible Projects (updated August 2026). Freddie Mac’s rules on this point are similar. Four parts matter most to boards.
Recent inspections get read
If a structural or mechanical inspection was completed within three years of the lender’s review, the lender must get it and read it. The report cannot show that critical repairs are needed. So an engineering report your board commissioned two years ago is part of every sale today, whether or not anyone mentions it.
Unaddressed critical repairs make a project ineligible
A project that needs critical repairs is ineligible until they are done and documented. Ineligible means lenders cannot sell those loans to Fannie Mae or Freddie Mac, so many will decline them, and buyers may need other, often harder-to-find, financing.
Critical repairs are ones that significantly affect safety, soundness, structural integrity or habitability, or the project’s financial viability. Fannie Mae’s examples include:
- material deficiencies that could lead to the failure of a critical element or system within a year;
- mold, water intrusion or potentially damaging leaks;
- advanced physical deterioration;
- failing a mandatory structural or safety inspection by a state, county or other jurisdiction;
- unfunded repairs costing more than $10,000 per unit that should be done within the next 12 months.
What does not count as critical
Two things are expressly carved out. Damage or deferred maintenance isolated to one or a few units, which does not affect the safety or soundness of the project as a whole, does not trigger these requirements. And routine work — preventive maintenance and normal capital replacement, paid for from the operating budget or a special assessment within guidelines — is not a critical repair. A board replacing a roof on schedule is doing exactly what the rules want.
After repairs, an engineer’s report closes the loop
Once critical repairs are finished, the lender must review an engineer’s report or a substantially similar document to confirm the repairs resolved the problem. A receipt from the contractor is not the same thing. If your association has just finished major structural work, a follow-up report is what lets lenders treat the issue as settled.
Lenders also look at every special assessment — its purpose, amount and payoff date. An assessment raised for a critical repair that has not yet been fixed keeps the project ineligible until the work is done.
Engineering report vs. reserve study
The two are easy to confuse, and lenders look at both.
- An engineering report answers: what condition is the building in right now, and does anything need fixing soon?
- A reserve study answers: what will the association need to replace over the next twenty or thirty years, and how much should it set aside each year to pay for it?
Some reserve studies are prepared by engineers and include a site inspection, so one document can sometimes do part of both jobs. But a reserve study is a funding plan. If a lender is asking whether a known structural problem has been fixed, it is an engineer’s findings that answer the question.
Also coming: 15% reserves from January 4, 2027
Reserves are the other half of the 2026 changes. Fannie Mae’s current rule asks that a condo budget put at least 10% toward replacement reserves . For loan applications dated on or after January 4, 2027, that rises to at least 15% of assessment income, clearly identifiable in the budget.
There is an alternative: an association can instead have a reserve study completed within the last three years and fund reserves at that study’s highest recommended level. Funding at the study’s minimum, or baseline, level no longer qualifies. With budget season under way, this is the change most boards can act on this winter.
What your board should do now
- Find what you already have. Gather any structural or mechanical inspection from the last three years, your most recent reserve study, and the board minutes that discuss repairs. A lender may read all of them.
- Read the last report for anything critical. If it flagged leaks, structural concerns or deterioration that has not been fixed, that is the item to prioritize — and to document when it is done.
- Plan for the follow-up report. When critical repairs are complete, budget for an engineer to confirm it in writing.
- Check your reserve line against 15%. If the 2027 budget falls short, decide now whether to raise it or rely on a current reserve study funded at its highest recommended level.
- Keep your answers consistent. Your minutes, reports and lender questionnaire answers should tell the same story. Inconsistencies are what slow a lender’s review down.
If you are new to the board, our guide for first-year board members covers how the budget and reserves are set, and our post on association meeting management explains how to keep decisions like these on the record.
Not sure where your association stands?
For the associations we manage, Full Circle handles lender questionnaires and resale certificates, so when a unit sells, we are the ones answering the lender’s questions about the project. If your board wants to know how its documents would read to a lender today, ask your property manager.
If your association is not one of ours and you are weighing up its management, see what we do on our property management page, including condo and HOA management.